Round 4, one hand, on the shell that shipped on 2026-08-05. A knowledge document is the only screen in the product where what you write and what the bot uses are not the same thing: you edit one block of prose, and the bot searches the chunks that block was cut into. This sheet puts those side by side.
article · area · process · fees ·
faq — the structured kinds have a typed shape the editor enforces, so the kind is
chosen once and the fields follow it.craft.md: that glyph is the null
placeholder in a data cell and nothing else.How a payment plan is usually structured. Most off-plan purchases in Dubai run on a 60/40 or 50/50 split. The buyer pays a deposit on booking, then instalments tied to construction milestones, and the balance on handover.
The booking deposit. Typically 10 to 20 percent of the price, paid when the reservation form is signed. It is not refundable once the sale and purchase agreement is issued.
Milestone instalments. Paid as the building reaches agreed stages, not on fixed dates. A delay in construction moves the instalment with it.
Post-handover plans. Some developers let the buyer keep paying for one to three years after they take the keys. It costs more overall and it is worth saying so plainly rather than selling it as free credit.
The content is written for this sheet and is not seeded knowledge. Every
field on it is one the payload already carries: title, kind,
category, tags, enabled, content,
chunks, situations and channels. Nothing here needs an
API change.
1. Are the pieces read-only, or can you move a boundary? This sheet shows them as a read-only consequence of what you wrote, which is honest and cheap. The alternative is letting an operator split or merge a piece by hand, which makes the retrieval much better and makes the document two sources of truth at once. I have drawn the cheap one.
2. The KB rewrite-from-zero is still open (agent-scope-14 items 6 and 7,
destructive, backup taken). This sheet draws the document as it exists today. If the re-scope
changes what a document IS, this sheet is drawn against the old shape and should be redrawn
after, not before.